- The garage roof is completed now and is ready to put tiles on (this step will wait until the house roof reaches the same stage),
- Impregnation of wood is progressing (25 m3 is taking some time...),
- Construction of the ceiling joists (? - hope that's the right word) is mid-way,
- ...and as a "bonus", Mr Jacek started to construct some of the walls, to make it feel more like at home ;-).
- There is also some progress with the budget planning. We may be able to reduce the overall costs by switching from a wood stove to a pellet stove. Together with some help offered by the parents-in-law, it should bring the costs back to Green :-).
We do have one new issue though - some of the wood is infected by a bug. The defect was escalated to the wood mill together with some live samples ;-) and they should provide a replacement. No impact on overall project schedule is expected.
The weather continues to be... hmm... not exactly perfect, but fortunately the workers are not complaining too much.
***
Po chwilowym okresie frustracji, budowa znowu ruszyła ostro do przodu:
- Konstrukcja dachu garażu jest gotowa na położenie dachówek (trochę z tym jednak poczekamy...),
- Impregacja drewna przez teściów ;-) postępuje w szybkim tempie,
- Została zamontowana część belek stropowych- wyglądają super!,
- No i w ramach niespodzianki, pan Jacek zmontował kawał ściany.
- A ponadto, pewnie uda się nam załatać dziurę w budżecie dzięki (manualnemu) wsparciu teściów oraz zamianie kominka na drewno na system na pellety :-).
Co do nowych problemów, to w drewnie wykryte zostały robale (nieduże w kolorze białym), no i część desek jest do wymiany. Pan Jacek załatwia sprawę z tartakiem.
Pogoda wciąż jest podła - codziennie leje - ale na szczęście nie wstrzymuje to za bardzo pracy.
Garage - inside and outside / Garaż z dachem:


And the house itself: / No i dom - stan obecny: